What We Do

Services

Everything we build, fix, and maintain on a deck, laid out plainly.

Home › Services

Everything we take on

Every job below is one we do ourselves across La Mesa.

Deck Installation

A new deck starts below grade, with footings sized to the soil and the beam span above them, not a number pulled off a chart. We frame with joists on 16-inch centers in most cases, tighter if you're going with composite decking, then run the decking, railings, and stairs on top.

Deck Repair

Soft spots usually mean a rotted joist or a ledger board that's been taking on water behind the flashing. We open up the area, replace what's gone bad, and check the rest of the frame while we're in there instead of patching one board and leaving the cause untouched.

Deck Staining & Sealing

Pine and cedar decking require a fresh coat of sealant every one to two years out here, the sun breaks down the finish faster than people expect. We pressure wash first, let the wood dry out fully, then stain, because sealing over trapped moisture just locks it in.

Custom Deck Design

Multi-level decks, built-in benches, pergola framing, whatever the yard calls for. We draw it out and size the structure before touching lumber, especially on sloped lots where a flat deck design just doesn't work.

Composite Decking Installation

Composite boards like Trex or TimberTech go down with hidden fastener clips instead of face screws, and they require a small gap at every butt joint for expansion. We still build a pressure-treated frame underneath, composite is a decking material, not a structural one.

Deck Railing Repair & Installation

Baluster spacing has to stay under 4 inches by code, and a lot of older decks don't meet that anymore. We rebuild railings to spec, re-set posts that have worked loose, and swap out cable rail or wood balusters depending on what you want.

Deck Resurfacing

If the frame underneath is still sound, there's no reason to tear the whole deck out. We strip the old decking, check every joist, and lay new boards, sometimes swapping wood for composite, on the structure already there.

Multi-Level Deck Construction

Stairs, landings, and more than one beam line make these more involved than a single flat deck. We work out the beam spans and footing locations level by level so the whole structure carries weight the way it's supposed to, not just the top deck.

Deck Board Replacement

Individual boards cup, crack, or rot faster than the rest of the deck, usually near a planter or a spot that holds water. We pull just the bad boards and match the material as closely as we can, though weathered wood never matches a new board exactly.

Pergolas & Deck Covers

A shade structure attached to an existing deck adds real weight and wind load to a frame that wasn't built for it. We check the existing joists and ledger before attaching anything, and add posts and footings where the frame can't carry it on its own.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across La Mesa, CA

Deck installation and repair across La Mesa and the surrounding San Diego area.

La Mesa, CA
San Diego, CA
Chula Vista, CA
Oceanside, CA
Escondido, CA
Carlsbad, CA
El Cajon, CA
Vista, CA
San Marcos, CA
National City, CA
Santee, CA
Coronado, CA
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit for a new deck?
In most San Diego County jurisdictions, a permit is required for any deck attached to the house or built more than 30 inches above grade. Freestanding, low decks sometimes fall under exempt projects, but checking with the local building department before starting avoids a stop-work order later.
How long does it take to build a deck?
A straightforward single-level deck typically takes one to two weeks from the first footing to the final board, weather and permit timing aside. Multi-level decks with stairs, landings, or custom railings can run three to four weeks.
Can you build within a set budget?
A target budget can be worked backward into material choice and deck size, since pressure-treated pine, cedar, and composite decking carry very different price points per square foot. Scaling the footprint or simplifying the railing design are common ways to bring a bid in line with a number.
Do you guarantee your work?
Workmanship is backed by a warranty covering the labor and construction, with specific terms spelled out in the written quote. Manufacturer warranties on composite decking or hardware are separate and handled directly through the product maker.
Who do I deal with day to day during the project?
A single point of contact, usually the person who did the original site visit and quote, handles questions and updates for the length of the project. That's also who walks the finished deck through before the job is called done.
What decking material do you recommend?
Pressure-treated pine costs the least but has to be resealed every year or two and will eventually show checking and splinters. Composite decking costs more upfront but holds its color and skips staining entirely, which pencils out over several years for most homeowners.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during construction, since deck work is contained to the footprint of the structure itself. Material staging and equipment access take up some space nearby, and that area typically isn't walkable until framing is complete.
How should I prepare the yard before work starts?
Clearing furniture, planters, and anything breakable away from the work area makes the first day faster. Access to the yard, through a gate or side path, should also be clear enough for lumber and equipment to get through without going through the house.
What happens if something unexpected turns up mid-job?
If a ledger board, rim joist, or footing turns out to be in worse shape than expected once the old decking comes off, that gets flagged immediately with photos and a cost before any extra work happens. Nothing gets replaced or added to the bill without that conversation first.
How should the finished deck be looked after?
Wood decking should be cleaned and resealed on a one-to-two-year cycle depending on sun exposure, with La Mesa's summer sun usually pushing that toward the shorter end. Composite decking just requires periodic washing to clear dirt and pollen, with no sealant required at all.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.